House construction cost calculator
Plan your house construction budget in Pakistan using your plot size, covered area, location and preferred finish. Compare grey structure and finishing costs, review estimated cash requirements at each construction stage, and get an indicative timeline for your project.
Get an estimate for your house
Project details
Estimates are for initial budgeting. Actual costs depend on the design, material specifications, site conditions and prevailing market rates.
Estimated cost for the main house grey structure only.
Main House Total CostRs. 1.22 croreHide / show
Basement Total CostRs. 0Hide / show
Estimated project range
This range is an indicative budgeting guide. Actual prices may differ with market conditions, material choices, design and site requirements.
Construction timeline
Indicative durations. Site conditions, weather, approvals and changes to the design may affect completion.
Contact Tameer and ask about Fast Track build.
Where your construction budget goes
See how the estimate is divided between grey structure and finishing, with an indicative view of labour compared with other costs.
Grey structure and finishing
Basement grey structure includes the selected basement premium.
Estimated materials and labour
This is an indicative split, not a separate labour quotation. The actual proportion depends on the work and contract specifications.
Cash required at each construction stage
Review the indicative budget allocation for each stage. The figures are planning estimates rather than a contractor payment schedule.
Stage-by-stage cost breakdownMain house budget
These allocations are planning estimates, not a contractor payment schedule. Your actual payment stages may differ.
House construction cost by plot size
Compare estimated costs for common plot sizes, assuming a double-floor house in Lahore. Covered area is the typical base area multiplied by 180% for two floors.
| Plot size | Typical covered area | Grey structure | Finishing | Estimated total |
|---|
The comparison uses Tameer planning rates for Lahore and assumes no basement. Two-floor covered area is calculated as 180% of the base area. Actual costs may vary with specifications, design and market rates.
Planning a house build? Let's talk.
If you would like help understanding your estimate or deciding what suits your budget, reach out to Tameer for an introductory call. Share your plans and questions with us, and we can help you explore the next steps.
This calculator provides indicative budgeting estimates, not a formal quotation. Land, approvals and society fees, architect fees, boundary walls and gates, furniture, appliances, air conditioning, solar systems and other items not expressly included are excluded.
House construction cost calculator
Plan your house construction budget in Pakistan using your plot size, covered area, location and preferred finish. Compare grey structure and finishing costs, review estimated cash requirements at each construction stage, and get an indicative timeline for your project.
Get an estimate for your house
Project details
Estimates are for initial budgeting. Actual costs depend on the design, material specifications, site conditions and prevailing market rates.
Estimated cost for the main house grey structure only.
Main House Total CostRs. 1.22 croreHide / show
Basement Total CostRs. 0Hide / show
Estimated project range
This range is an indicative budgeting guide. Actual prices may differ with market conditions, material choices, design and site requirements.
Construction timeline
Indicative durations. Site conditions, weather, approvals and changes to the design may affect completion.
Contact Tameer and ask about Fast Track build.
Where your construction budget goes
See how the estimate is divided between grey structure and finishing, with an indicative view of labour compared with other costs.
Grey structure and finishing
Basement grey structure includes the selected basement premium.
Estimated materials and labour
This is an indicative split, not a separate labour quotation. The actual proportion depends on the work and contract specifications.
Cash required at each construction stage
Review the indicative budget allocation for each stage. The figures are planning estimates rather than a contractor payment schedule.
Stage-by-stage cost breakdownMain house budget
These allocations are planning estimates, not a contractor payment schedule. Your actual payment stages may differ.
House construction cost by plot size
Compare estimated costs for common plot sizes, assuming a double-floor house in Lahore. Covered area is the typical base area multiplied by 180% for two floors.
| Plot size | Typical covered area | Grey structure | Finishing | Estimated total |
|---|
The comparison uses Tameer planning rates for Lahore and assumes no basement. Two-floor covered area is calculated as 180% of the base area. Actual costs may vary with specifications, design and market rates.
Planning a house build? Let's talk.
If you would like help understanding your estimate or deciding what suits your budget, reach out to Tameer for an introductory call. Share your plans and questions with us, and we can help you explore the next steps.
This calculator provides indicative budgeting estimates, not a formal quotation. Land, approvals and society fees, architect fees, boundary walls and gates, furniture, appliances, air conditioning, solar systems and other items not expressly included are excluded.